Green Practices
Five working pillars.
Air, water, energy, design, and innovation. Each pillar collects the technologies and operating decisions that shape a terminal’s environmental footprint, written for the people who have to build and run the place.
Practice Areas
Pick a pillar. Get the specifics.
Every practice page follows the same rule: name the technology, show the numbers, state the tradeoffs. These are approaches TDG has built, priced, or tracked closely enough to report on honestly.

Practice 01 / 05
Air Quality
Marine hoteling emissions, GenSet switching locomotives, AMECS and ALECS treatment, and Clean Air Action Plans.

Practice 02 / 05
Water Systems
Bioswales, retention systems, porous pavement, and floating berths for shallow-water habitat preservation.

Practice 03 / 05
Energy Efficiency
Solar PPAs and leases, SRECs, RECs, FITs, and the financing that makes on-site generation pencil out.

Practice 04 / 05
Terminal Design
Zoned pavement sections, high SRI surfaces, rainwater capture, and open-grid paving at terminal scale.

Practice 05 / 05
Innovation & Resilience
Emerging technologies and case-led learnings from peer ports. Updated as field data comes in.
Proven In The Field
Where these practices have shipped.
Five facilities where an approach was implemented, measured, and either kept or revised. Client names and numbers included.
Water Systems
T6 Porous Pavement
Port of Portland. Multi-decade porous-asphalt installation with the spec, maintenance program, and cold-weather record.
Read the case study →
Water Systems
T4 Storm Water Features
Port of Portland. Structural treatment combined with bioswales and riparian-buffer integration on a working terminal.
Read the case study →
Air Quality
GenSet Switching Locomotives
Port of Richmond. GenSet switching under a Clean Air Action Plan cut NOx 58 percent, PM 80 percent, and fuel 20 percent.
Read the case study →
Energy Efficiency
Westborough Solar
Transflo. PV siting and financing analysis with cash purchase, PPA, and lease structures modeled side by side.
Read the case study →
Terminal Design
Toyota Logistics Services
Port of Portland. Zoned pavement sections matched to actual loading conditions on a finished-vehicle terminal.
Read the case study →
Full Index
Browse the case library
Every case study in one place, including projects that were not TDG builds but carry lessons for terminal development.
All case studies →
Partner With Us
Which pillar fits your terminal?
Tell us about your facility and we will point you at the practices and case studies that apply.