Case Study · Terminal Design
Pavement matched to the actual load.
Toyota Logistics Services moves finished vehicles through the Port of Portland. The design question was easy to state and rarely asked: why pave an entire terminal for heavy trucks when most of the yard parks light vehicles?
Toyota Logistics project details
-
Client
-
Toyota Logistics Services
-
Location
-
Port of Portland
-
Practice
-
Terminal Design
-
Approach
-
Zoned pavement sections
The challenge
US automotive terminals are routinely paved to the heaviest section across the entire site, sized for loaded car haulers everywhere, even though technical studies show required pavement sections varying by three hundred percent between the lightest and heaviest duties on the same facility. At a finished-vehicle terminal the mismatch is extreme: over eighty percent of the area does one job, parking light vehicles that will never stress a heavy-duty section.
The approach
The terminal was planned around zoned pavement sections based on the intended use of each area. That starts with a master plan that maps the operating flows of vehicles, material, and personnel across the site, and accounts for the changes expected within the planning horizon. Heavy-duty paving is used judiciously where car haulers and transloading equipment actually run; the extensive light-duty storage bays get sections sized for the loads they really carry.
Zoning also frees the choice of material per area. Employee parking and private drives can use porous pavements, including vegetated blocks. Extensive light-duty areas suit porous asphalt. Heavy-duty corridors use impervious concrete, which brings higher strength and high surface reflectivity where the loads are concentrated. A pre-planned program to remove and replace the lightest sections during a future rehabilitation keeps the design honest over the life of the site.
The result
Zoning greatly reduces the quantity of pavement material a terminal consumes, which saves construction energy and conserves petroleum-based paving products along with the budget that buys them. The secondary effects stack: porous light-duty zones cut storm water runoff and recharge groundwater, while reflective concrete in the heavy zones works against the heat island effect.
The honest tradeoff is operating discipline. A zoned yard stays zoned only if operations respect the layout and keep heavy equipment off the light sections. That is a management commitment, and it is the price of not paving eighty percent of a terminal for traffic it will never see.
80%+
Of the terminal area used for light vehicle parking, the design basis for zoning
300%
Spread between the lightest and heaviest pavement sections the loads require
3
Pavement classes zoned to use: porous block, porous asphalt, concrete
Keep Reading
The practice behind this project.
Practice 04 · Terminal Design
Terminal Design
Zoned pavements, high-SRI surfaces, open grid paving, and the LEED strategies that transfer to terminal development.
Explore the practice →
Full Index
All case studies
Five worked examples across the practice areas, each with the site, the approach, and what came out of it.
Browse the index →
Water Systems
T6 Porous Pavement
Port of Portland. The multi-decade porous-asphalt installation that anchors the light-duty end of the zoning argument.
Read the case study →
Partner With Us
Paving more terminal than you use?
Send us your operating flows. We will show you where zoned sections can cut material, cost, and runoff on your site.